Today's Jobsite Timeline
Crew check-in — Mike Holloway
Framing Foreman · Framing Contractor · QR check-in at gate
First on siteCrew check-in recorded — 6 framers
Framing Contractor framing crew checked in via QR. Fall protection certifications verified.
Lumber delivery confirmed — Lumber Supplier
Framing lumber package for Units 4–7. Condition: Good. Received by Mike H.
Delivery confirmedSite photo uploaded — Morning progress
Framing progress on Unit 5 second floor. Uploaded by Mike Holloway.
ProgressFraming inspection passed — Units 1–3
Inspector: R. Chen, City of Oakville. All structural framing approved. No deficiencies noted.
PassedCrew check-in — Electrical Contractor
4 electricians checked in for rough-in work. Lead: Dave Torres.
Electrical rough-in started — Units 1–3
Electrical Contractor beginning rough-in on framing-inspected units. Panel locations marked.
In progressSafety photo uploaded — Scaffolding setup
Scaffolding compliance photo for Unit 6 exterior. Uploaded by site supervisor.
SafetyElectrical supplies delivered — Electrical Supply Co.
Panel boards, wire, and conduit for Units 1–3 rough-in. Condition: Good.
Delivery confirmedWaste bin pickup scheduled — Waste Service Provider
20-yard mixed construction waste bin. Pickup scheduled Friday March 20.
ScheduledField note — Plumbing rough-in coordination
Plumbing sub (Plumbing Contractor) confirmed for Monday. Framing in Units 4–5 must be complete by end of day Friday.
On-Site Crew
Workers check in by scanning a project QR code at the site entrance. Check-in verifies identity, employer, trade, and certifications against the project workspace records.
Mike Holloway
Framing Foreman
Framing Contractor Ltd.
Dave Torres
Electrical Lead
Electrical Contractor
Raj Singh
Framing Carpenter
Framing Contractor Ltd.
Jason Leblanc
Apprentice Framer
Framing Contractor Ltd.
Karen Park
Site Supervisor
Project Developer
Alex Moreno
Electrician
Electrical Contractor
Jobsite Photos
Photos uploaded from the field are tagged by category and linked directly to the project timeline. Each photo records the uploader, timestamp, and category for project documentation.
Unit 5 — Second Floor Framing
8:15 AM · Mike Holloway
ProgressScaffolding — Unit 6 Exterior
12:20 PM · Karen Park
SafetyFraming Inspection — Units 1–3
9:10 AM · R. Chen (Inspector)
InspectionCracked Foundation — Unit 7
11:10 AM · Karen Park
IssueLumber Delivery — Lumber Supplier
7:30 AM · Mike Holloway
ProgressElectrical Rough-In Start
11:50 AM · Dave Torres
ProgressPPE Compliance Check
7:10 AM · Karen Park
SafetyWaste Bin — Fill Level
2:05 PM · Jason Leblanc
ProgressInspection Reports
Inspections are logged directly from the jobsite and appear in the project activity feed. Each record captures the inspection type, inspector, result, notes, and optional photo documentation.
Framing Inspection — Units 1–3
PassedElectrical Rough-In — Units 1–3
ScheduledFoundation — Unit 7
PartialPlumbing Rough-In — Units 1–3
ScheduledMaterial Deliveries
Jobsite staff confirm deliveries directly from the field. Each delivery records the supplier, materials, arrival time, condition, and receiving worker, feeding into the project timeline.
Lumber Supply Co.
GoodElectrical Supply Co.
GoodFastener Supply Co.
PartialReady-Mix Supplier
En RouteActive Equipment
Excavator — CAT 320
Operator: Foundation Contractor
Runtime: 12h today
Task: Unit 7 foundation repair prep
Boom Lift — JLG 600S
Operator: Framing Contractor
Runtime: 6h today
Task: Unit 6 exterior sheathing
Concrete Pump — 42m
Operator: Ready-Mix Supplier
Scheduled: 3:30 PM today
Task: Unit 7 foundation patch
Bin & Waste Activity
Waste Service Provider — 20-Yard Bin
Status: On site — ~75% full
Delivered: March 10, 2026
Pickup scheduled: Friday March 20
Waste Service Provider — 12-Yard Bin
Status: Swap requested
Delivered: March 8, 2026
Swap scheduled: Wednesday March 18
How the Jobsite Connects to the Platform
Every action at the jobsite feeds into the project workspace. Workers, deliveries, inspections, and notes flow through a structured pipeline that keeps the entire project team informed in real time.
Live Project Activity
Simulated Demo Feed
-
update
Foreman posted daily site update after morning safety and pre-task plan.
-
delivery
Drywall shipment checked in at gate and moved to level 1 staging.
-
issue
Issue log recorded water ingress at temporary roof opening.
-
coordination
Coordination note shared to stagger lift access for framing and HVAC crews.