TradeForge Project Workspace — Flooring Contractor Demo

You are a flooring contractor managing scope and material risk on a live build.

This page shows a trade workspace where scope changes, takeoff updates, and supplier coordination are handled in one flow.

What to look for

  • Change-alert handling before rework starts on site.
  • Auto-updated takeoff quantities after spec revisions.
  • Complete activity trail across GC, suppliers, and trade crew actions.

How to explore this demo

  1. Review scope changes, active alerts, and updated takeoff quantities.
  2. Check material status and supplier coordination for the current phase.
  3. See the full activity trail across GC, suppliers, and trade crews inside TradeForge.
Back to Demo Lab

Demo LabFlooring Contractor Workflow

Flooring Contractor

Flooring Subcontractor — Eastgate Commons (24 units) · GC: General Contractor

Verified Trade 1 Active Change Alert Active Project

Quick Actions

24
Total Units
3 unit types across 8 floors
18,400
Total Sq Ft
Flooring scope for full project
3
Material Types
Vinyl plank · Carpet · Tile
1
Change Alert
Spec change — Type B units
Flooring Scope by Unit Type — Eastgate Commons
Project: Eastgate Commons, 24 units · GC: General Contractor
Unit Type Floors Units Flooring Material Sq Ft / Unit Total Sq Ft Status
Type A — 1 Bed Floors 1–3 9 units Vinyl Plank 620 sq ft 5,580 sq ft On Track
Type B — 2 Bed Floors 4–8 10 units Carpet Vinyl Plank 850 sq ft 8,500 sq ft Spec Changed
Type C — Studio Floors 1–8 5 units Tile 480 sq ft 2,400 sq ft On Track
Common Areas All Floors Tile 1,920 sq ft On Track
Change Requests / Issues
Eastgate Commons · 4 open items
Issue Status Assigned To Next Step
CR-041 — Carpet removal scope for units B-401 to B-602 Approved Flooring Crew A Schedule rework — week of Mar 23
CR-042 — Vinyl plank colour mismatch reported (Unit B-501) Under Review Local Floor Supply Supplier to confirm batch number
CR-043 — Underlayment spec unclear for tile areas (Type C) Open General Contractor Awaiting architect clarification
CR-044 — Transition strip detail missing at unit entries Logged Flooring Crew B Site walkthrough scheduled Mar 20
Change alert detected — The architect changed Type B flooring from carpet to vinyl plank. View the impact.

Flooring Spec Change — Type B Units

Issued by General Contractor (GC) · March 14, 2026 · CO-2026-042

Action Required

What Changed

Carpet (Standard Broadloom) Vinyl Plank (Premium LVP)

Architect revised interior finish schedule. Type B bedroom and living areas changed from broadloom carpet to luxury vinyl plank for moisture resistance and durability.

Where It Applies

Type B — 2 Bedroom Units · Floors 4–8
10 units affected — Units B-401, B-402, B-501, B-502, B-601, B-602, B-701, B-702, B-801, B-802
850 sq ft per unit · 8,500 sq ft total scope change

Affected Units

B-401
B-402
B-501
B-502
B-601
B-602
B-701
B-702
B-801
B-802
Installed under previous spec (6) Not yet installed (4)

6 units may already be installed under the previous spec (carpet). Units B-401 through B-602 were completed before this change order was issued. Confirm rework scope with General Contractor before proceeding.

View updated takeoff — See the revised material quantities based on this change.
Takeoff Assist — Flooring Materials
Draft — Review Required

Eastgate Commons — Full Flooring Takeoff

Generated: March 15, 2026 · Reflects CO-2026-042
Line Material Area Sq Ft + 10% Waste Boxes Source
1 Premium LVP — Vinyl Plank Type A (9 units × 620 sq ft) 5,580sq ft 6,138sq ft 256boxes Original
2 Premium LVP — Vinyl Plank Type B (10 units × 850 sq ft) 8,500sq ft 9,350sq ft 390boxes Changed
3 Porcelain Tile — 12×24 Matte Type C (5 units × 480 sq ft) 2,400sq ft 2,640sq ft 132boxes Original
4 Porcelain Tile — 12×24 Matte Common Areas (lobbies, corridors) 1,920sq ft 2,112sq ft 106boxes Original
5 Vinyl Plank Underlayment Type A + Type B (19 units) 14,080sq ft 14,080sq ft 47rolls Updated
6 Transition Strips — T-Mould All vinyl-to-tile transitions 48 linear ft per unit × 19 units 912lin ft Updated
7 Tile Mortar & Grout Type C + Common Areas 4,752 sq ft total tile coverage 24bags Original
18,400
Total Sq Ft
7
Line Items
884
Boxes / Units
3
Items Updated

Carpet removed from takeoff. Standard Broadloom broadloom (previously 8,500 sq ft for Type B) has been removed per CO-2026-042. If rework is confirmed on units B-401 through B-602, carpet removal labour will need to be scoped separately.

View the activity feed — See who was notified, who acknowledged, and the full audit trail.
Activity Feed — Flooring Change Trail
Eastgate Commons · Full audit trail

Change Order Issued — CO-2026-042

General Contractor issued a flooring spec change for Type B units (Floors 4–8). Carpet replaced with vinyl plank (Premium LVP). Reason: architect revised interior finish schedule for moisture resistance.

March 14, 2026 · 9:15 AM Change Order

Notification Sent — Flooring Contractor

Change alert automatically sent to Flooring Contractor (flooring sub) and Local Floor Supply (material supplier). Includes affected units, scope, and updated spec reference.

March 14, 2026 · 9:16 AM Sent

Acknowledged — Project Lead, Flooring Contractor

Flooring Contractor acknowledged the change. Noted that 6 units (B-401 through B-602) were already installed with carpet under the previous spec. Flagged for rework confirmation.

March 14, 2026 · 10:42 AM Acknowledged

Acknowledged — Local Floor Supply

Local Floor Supply confirmed receipt. Indicated Premium LVP availability and estimated 5-day lead time for the additional 390 boxes. Awaiting PO confirmation.

March 14, 2026 · 11:30 AM Acknowledged

Takeoff Updated — Flooring Materials

Takeoff assist generated updated material list reflecting CO-2026-042. Carpet line items removed. Vinyl plank quantities increased. Underlayment and transitions recalculated for 19 vinyl units.

March 15, 2026 · 8:00 AM Draft — Review Required

Rework Scope Requested — Project Lead

Flooring Contractor submitted a question to General Contractor: confirm whether units B-401 through B-602 require carpet removal and vinyl install, or if those units stay as-is under the original spec.

March 15, 2026 · 9:20 AM Awaiting Response

GC Response — General Contractor

General Contractor confirmed: units B-401 through B-602 will require carpet removal and vinyl plank installation to match the updated spec. Rework costs to be covered under CO-2026-042.

March 16, 2026 · 2:10 PM Confirmed

Takeoff Finalized — Full Vinyl Scope

Material list finalized to include all 10 Type B units. Total vinyl plank order: 646 boxes (Type A + Type B). Procurement pending review and PO issue to Local Floor Supply.

March 17, 2026 · 7:45 AM Updated
Site Photos — Visual Progress Log
Eastgate Commons · Flooring Install

Type A unit — vinyl plank installed, living area complete

March 10, 2026 Complete

Unit B-501 — carpet installed under previous spec before change order

March 12, 2026 Rework Pending

Floor 3 corridor — porcelain tile layout in progress

March 13, 2026 In Progress

Material staging area — vinyl plank boxes received from Local Floor Supply

March 15, 2026 Delivered

Type C studio — tile grouting complete, transition strip installed

March 16, 2026 Complete

Unit B-401 — carpet removal started ahead of vinyl plank rework

March 17, 2026 In Progress

6 photos logged. Site photos are organized by date and tagged with progress status. In a live workspace, photos can be uploaded from a phone or tablet directly on the jobsite.

Project Documents
Eastgate Commons · 6 documents
Document Type Version Uploaded Status
Flooring Layout — Rev 3 (Eastgate Commons) Drawing v3.0 Mar 14, 2026 Current
Spec Sheet — Vinyl Plank (LVP-440 Series) Specification v1.2 Mar 11, 2026 Current
Change Order CO-041 — Type B Carpet to Vinyl Plank Change Order v1.0 Mar 12, 2026 Approved
Material Submittal — Porcelain Tile (Type C Common Areas) Submittal v2.0 Mar 8, 2026 Under Review
Subcontract Agreement — Flooring Supplier Inc. Contract v1.0 Feb 20, 2026 Signed
Site Safety Plan — Flooring Operations Safety v1.1 Mar 3, 2026 Current

6 documents on file. Project documents are version-tracked and linked to the workspace. In a live environment, team members can upload, review, and download documents directly from the project workspace.

Live Project Activity

Simulated Demo Feed

  • update

    Workspace update posted after scope change approval for flooring package.

  • delivery

    Material order confirmation attached to procurement thread in project workspace.

  • issue

    Issue log created for takeoff variance against revised drawing set.

  • coordination

    Coordination note published to align trade schedule with revised milestone dates.